The warehouse at Dove Valley was formed within a hollow on the site and required a sweeping RC entrance ramp with gatehouse. Due to level differences, the site required installation of PCC L-Walls adjacent to the building and also on the boundary of the existing pedestrian footpath and road.
Initially undertaking the enabling works including the main access spine road, services, drainage, headwalls and Tarmac. Hannon Brothers were awarded the main works which consisted of the construction of 4nr new units over 2 sites.
Creation of a new unit built over previous cooling tower foundations and RC Culvert taking water from the adjacent River Trent. The new plot is now adjacent to a busy road and rail freight terminal.
Creation of 6nr new units and associated access roads/ car parks on an old landfill tip that previously housed the old Imperial Tabacco factory.
One of the first fully EV future-proofed projects we undertook. The job required careful planning to maintain full use of a pedestrian and cycle path through the project.