Demolition of an existing 1,000,000 sqft warehouse & re-development into three smaller units.
Extension, & new Warehouse to an existing processing facility for TASK consumer products.
Construction of the Integrated Logistics Centre, for the Luxury Car Manufacturer Bentley
Construction of a 500,000sqft warehouse & adoptable road, for future connection to a new A50 junction.
Initially undertaking the enabling works including the main access spine road, services, drainage, headwalls and Tarmac. Hannon Brothers were awarded the main works which consisted of the construction of 4nr new units over 2 sites.
Creation of 6nr new units and associated access roads/ car parks on an old landfill tip that previously housed the old Imperial Tabacco factory.
The new head facility of the Aston Martin F1 team's Research & Development department.
Construction of a new Temple for The Church of Jesus Christ of Latter-day Saints.
Infrastructure and enabling works for a luxury wellness destination.
Delivery of infrastructure and groundworks on a remediated brownfield site.
Enabling works inside the wire to create a site compound area, including site strip/tree surgery to enable underground service scan.
Creation of a new unit built over previous cooling tower foundations and RC Culvert taking water from the adjacent River Trent. The new plot is now adjacent to a busy road and rail freight terminal.
New drainage FW outfall and installation 4m deep Weholite storage tank.
Extending to a total of 136 acres, Symmetry Park (Kettering). Situated directly alongside the A14 “Trans-European” freight route at Junction 9.
New warehouse acquisition, the new owner required adjustments to suit their revised production needs.
Amazon upgrade to an existing depot, following break out of internal warehouse slab and piling with 769nr 250sq pre-cast piles.
Live food factory extension with foundations, internal floor slabs (cast to falls for sterile washdown facility), yard slabs (including alterations to existing drainage), services and plant bases for new equipment and freezer facilities etc. whilst maintaining access and production for the owner.
The warehouse at Dove Valley was formed within a hollow on the site and required a sweeping RC entrance ramp with gatehouse. Due to level differences, the site required installation of PCC L-Walls adjacent to the building and also on the boundary of the existing pedestrian footpath and road.
No content provided
A state-of-the-art material recycling facility for Coventry & six other county councils, involving a huge amount of insitu Reinforced Concrete Works.
Originally contracted to complete unit 4, this developed into completing 3nr plots. Our client wished to retain us as the groundworks contractor throughout.
Kirkby-In-Ashfield Leisure Centre
Marine valve manufacturer for the defence industry.
One of the first fully EV future-proofed projects we undertook. The job required careful planning to maintain full use of a pedestrian and cycle path through the project.
New Fletton Quays hub in Peterborough city centre, to house 1,000 civil servants from HM Passport Office and the Department for Environment, Food & Rural Affairs (Defra).
Enabling Package
Amazon super-depot distribution facility
278 Works
Mountpark Warrington Omega II is a development at the gateway to Omega South comprising three units totalling 736,884 sq ft.
Completion of 2 new warehouse units with the future expansion ability for a head office building.
Two new warehouse facilities as part of a wider development scheme in Wellingborough
Extension of Forterra Brickworks in Coalville
Extension of existing Photolabs Manufacturing facilities
9,000 sq ft of office space, almost 16,000 sq ft of brewery space and more than 11,000 sq ft of space for shops and food and drink outlets.
Distribution, training and office unit site for the manufacturer 158,000 sq. ft.
Phase 2 of the £18m Nicholas Chamberlaine Secondary School
Two Warehouse development Immediately adjacent to the M1/M69 intersection in Leicestershire (East Midlands)
Plot 3 development on Fore Business Park, Solihull.
The new development acts as a link between neighbouring sites such as the Spiceball Leisure Centre, Chamberlaine Court andCastle Quay shopping centre.
A small enabling package for our valued client McLaren Construction Group