McLaren Construction Group

Banbury - Castle Quay

Commercial
Retail

48 wks

-

Duration

£8.6m

-

Order Value

Banbury

-

Location

McLaren Construction Group

Client

Project Details

The new development acts as a link between neighbouring sites such as the Spiceball Leisure Centre, Chamberlaine Court andCastle Quay shopping centre.

improving connectivity within the town centre and ensuring a dynamic evening economy for residents and visitors alike. The new 506,000sqft Castle Quay Waterfront development includes a 117-bed Premier Inn, ten-screen Light Cinema and 244 new parking spaces. The development also features a new Lidl superstore with a 438-space two-level car park. Public realm works include associated road works, as well as the installation of a new canal bridge next to the existing shopping centre. Hannon Brothers were responsible for the foundations, drainage, services and the company also undertook some of the above ground RC work and waterproofing finishes including kerbs, channel drainage, paving and street furniture. Although this was a logistically challenging project which involved having to work around the public and the live Castle Quay shopping centre, the result is a stunning addition to the area that will be enjoyed by many.

Related Media

Case study

Ansty - Project Holst

Initially undertaking the enabling works including the main access spine road, services, drainage, headwalls and Tarmac. Hannon Brothers were awarded the main works which consisted of the construction of 4nr new units over 2 sites.

View Full Case Study

Case study

Derby - EMDC

Creation of a new unit built over previous cooling tower foundations and RC Culvert taking water from the adjacent River Trent. The new plot is now adjacent to a busy road and rail freight terminal.

View Full Case Study

Case study

Nottingham - Power Park

Creation of 6nr new units and associated access roads/ car parks on an old landfill tip that previously housed the old Imperial Tabacco factory.

View Full Case Study

Case study

Gloucester - Centre 7 Amazon Unit

One of the first fully EV future-proofed projects we undertook. The job required careful planning to maintain full use of a pedestrian and cycle path through the project.

View Full Case Study

Case study

Redditch - Amazon Gateway

Amazon super-depot distribution facility

View Full Case Study